Commissioning
Functional tests, parameter setup and training, before the system takes the load.
Commissioning is the final check that the system will behave as designed. We test each device individually and then the whole system together: what happens on mains failure, on the failure of one unit, and when the supply returns.
- Check of installation and connections before first power-up
- Setting of parameters, protections and alarms
- Load test with a resistive load bank
- Mains failure test for the whole site
- Connection to BMS, SCADA or remote monitoring
- Staff training and handover
- Commissioning record with measured values
- Operating instructions
- Staff training confirmation